Project name:Detailed Engineering for the Pahuaypite 1 and 2 tailings deposits and the Pahuaypite 2 waste dump 29/01/2025 by laraconsulting
Basic Engineering of Deposit 7 and the Filtered Waste Treatment Plant (PTRF) 29/01/2025 by laraconsulting
Conceptual and Feasibility Engineering of the Julcani UEA Filtered Tailings Deposit and Plant owned by Compañía de Minas Buenaventura 29/01/2025 by laraconsulting
Conceptual and Feasibility Engineering of the Julcani UEA Filtered Tailings Deposit and Plant owned by Compañía de Minas Buenaventura 29/01/2025 by laraconsulting
Prefeasibility study for processing and laboratory testing of pyrite stockpiles at the Cerro de Pasco UM Oxide Plant (CdP), owned by Volcan Compañía Minera (VCM) 04/02/202529/01/2025 by laraconsulting
Lifespan of the R9 dam reservoir as a clarifier for the Julcani MU owned by Compañía de Minas Buenaventura 29/01/2025 by laraconsulting
Technical support for San Rafael tailings studies at the permit feasibility level 29/01/2025 by laraconsulting
Estudio de Factibilidad de la Planta de Relaves Centrifugados en B4 a5700 tpd 29/01/2025 by laraconsulting