Construction report for tailings extraction from R8 and disposal at the Herminia pit – U.E.A.(Administrative economic unit) 31/01/2025 by laraconsulting
Feasibility study for the extraction of tailings from the R7 deposit and disposal in the R1-R5 Deposit – U.E.A.(Administrative economic unit) Julcani 31/01/2025 by laraconsulting
Conceptual and Feasibility Engineering of the Julcani UEA Filtered Tailings Deposit and Plant owned by Compañía de Minas Buenaventura 29/01/2025 by laraconsulting
Lifespan of the R9 dam reservoir as a clarifier for the Julcani MU owned by Compañía de Minas Buenaventura 29/01/2025 by laraconsulting
Engineering uptdate for the ninth modification PDC: Herminia Pit Reservoir – R1 R5 Reservoir – U.E.A.(Administrative economic unit) 29/01/2025 by laraconsulting
Detailed engineering of the heightening of the R1-5 reservoir – Stage 1A – U.E.A.(Administrative economic unit) 29/01/202529/01/2025 by laraconsulting
Quality assurance (CQA) of the execution of earthworks and civil works of the R1-5 tailings dam, U.E.A.(Administrative economic unit) 29/01/202529/01/2025 by laraconsulting
QA of the extraction of tailings from the R8 tailings deposit and its deposition in the Tajo Herminia and QA of the reinforcement of the R1 – R5 buttress – U.E.A.(Administrative economic unit) 29/01/202529/01/2025 by laraconsulting