Tailings management alternatives in B4 to reduce leak risks and optimization of long-term tailings management alternatives 29/01/2025 by laraconsulting
Feasibility Study of the Niño Perdido Centrifugal Paste Tailings Plant and Deposit 29/01/2025 by laraconsulting
Engineering uptdate for the ninth modification PDC: Herminia Pit Reservoir – R1 R5 Reservoir – U.E.A.(Administrative economic unit) 29/01/2025 by laraconsulting
Engineering update and preparation of deliverables to support the ITS of the Tailings Thickening System and its transportation to the Atacocha Tailings Deposit 29/01/2025 by laraconsulting
Engineering For The Hydraulic Barrier System For Filtrationss Of The Huachuacaja Tailings Deposit 29/01/2025 by laraconsulting
Complementary studies for updating the stability analysis of tailings ponds R1-R2, R3 and R4 29/01/202529/01/2025 by laraconsulting
Feasibility engineering for the expansion of the R4 Deposit with filtered tailings – Stage 1 and 2 29/01/202529/01/2025 by laraconsulting