Skip to content
  • (+51) 941 290 893
  • contacto@laraconsulting.com.pe
EspañolES
  • Home
  • About us
  • Services
    • Geotechnical Engineering
    • Mine Waste
    • Quality Control
    • Process Plants
    • Geological Engineering
  • Projects
  • Blog
  • Work with us
  • Contact
Menu
  • Home
  • About us
  • Services
    • Geotechnical Engineering
    • Mine Waste
    • Quality Control
    • Process Plants
    • Geological Engineering
  • Projects
  • Blog
  • Work with us
  • Contact

laraconsulting

Conceptual Engineering of the Tailings Management System

29/01/2025 by laraconsulting
Categories Process Plants Leave a comment

Tailings management alternatives in B4 to reduce leak risks and optimization of long-term tailings management alternatives

29/01/2025 by laraconsulting
Categories Process Plants Tags San Rafael Mining Unit Leave a comment

Feasibility Study of the Niño Perdido Centrifugal Paste Tailings Plant and Deposit

29/01/2025 by laraconsulting
Categories Process Plants Tags Raura Mining Unit Leave a comment

Engineering uptdate for the ninth modification PDC: Herminia Pit Reservoir – R1 R5 Reservoir – U.E.A.(Administrative economic unit)

29/01/2025 by laraconsulting
Categories Geology Tags Julcani Mining Unit Leave a comment

Engineering update and preparation of deliverables to support the ITS of the Tailings Thickening System and its transportation to the Atacocha Tailings Deposit

29/01/2025 by laraconsulting
Categories Geology Tags Atacocha Mining Unit Leave a comment

Physical Stability Analysis Of The Ptaa – Dmo Ciénaga Norte

29/01/202529/01/2025 by laraconsulting
Categories Geology Tags Tantahuatay Production Unit Leave a comment

Engineering For The Hydraulic Barrier System For Filtrationss Of The Huachuacaja Tailings Deposit

29/01/2025 by laraconsulting
Categories Geology Tags Colquijirca Mining Unit Leave a comment

Complementary studies for updating the stability analysis of tailings ponds R1-R2, R3 and R4

29/01/202529/01/2025 by laraconsulting
Categories Geology Tags Shila Paula Mining Unit Leave a comment

Feasibility engineering for the expansion of the R4 Deposit with filtered tailings – Stage 1 and 2

29/01/202529/01/2025 by laraconsulting
Categories Geology Tags Orcopampa Mining Unit Leave a comment

Tantahuatay Mining unit – Quality Assurance (QA) Service

29/01/202529/01/2025 by laraconsulting
Categories Quality Control and Management Tags Tantahuatay Production Unit Leave a comment
Older posts
Newer posts
← Previous Page1 Page2 Page3 Page4 Page5 Next →
Lara Consulting is a leading company in mining, construction and sustainability in Peru. With more than 10 years of experience, we offer services in mining waste, geotechnics, quality control and process plants.
Linkedin-in Youtube
Services
  • Mining waste
  • Geotechnical engineering
  • Control and quality
  • Process plants
Projects
  • Geological Engineering
  • Geotechnical Engineering
  • Mine Waste
  • Process Plants
  • Quality Control
Links of interest
  • Work with us
  • Privacy Policy
  • Cookie Policy
  • Legal notice
Contact
  • 941 290 893
  • contacto@laraconsulting.com.pe
Lara Consulting & Engineering S.A.C. © 2024 | Rights Reserved
Developed by Yukio Digital