Orcopampa Mining Unit
--- Geology ---
Feasibility engineering for the expansion of the R4 Deposit with filtered tailings – Stage 1 and 2
- Fecha: -
- - 2024
- Coordenadas: PMG8+V67, AR-660, Orcopampa 04656
- Resumen: Lara Consulting developed the feasibility engineering for the expansion of the R4 tailings dam by means of filtered tailings disposal, in compliance with the requirements established by CMB. The project included the definition of design criteria, geotechnical characterization of the foundation material, analysis of physical stability in static and pseudo-static conditions, design of the tailings disposal plan and hydraulic systems, and a conceptual proposal for water management in operation and closure. The results were consolidated in a final report accompanied by feasibility drawings, ensuring compliance with technical and regulatory standards.
-
Descripción:
- Geological-geotechnical survey
- Design of the R7 and R1-R5 tailings deposit for approval by CMB
- Supervision of geotechnical drilling in the R7 and R1-R5 basin
- Geotechnical characterization of the R7 reservoir basin and the R1-R5 reservoir
- Design of R7 tailings extraction works
- Update of the stability and filtration analysis of the R1-R5 tailings deposit
- Design of works in the R1-R5 reservoir
- Conceptual design of the R1-R5 reservoir
- Drawings