QA SUPERVISION OF THE PROJECT – CONSTRUCTION OF THE WEST DIKE HEIGHTENING OF TAILINGS DAM R4A elevation: 3 811 m a.s.l. 31/01/2025 by laraconsulting
Feasibility engineering for the expansion of the R4 Deposit with filtered tailings – Stage 1 and 2 29/01/202529/01/2025 by laraconsulting