Conceptual and Feasibility Engineering of the Julcani UEA Filtered Tailings Deposit and Plant owned by Compañía de Minas Buenaventura 29/01/2025 by laraconsulting
Engineering For The Hydraulic Barrier System For Filtrationss Of The Huachuacaja Tailings Deposit 29/01/2025 by laraconsulting
Quality assurance for the stabilization of the R2 and R4 tailings deposits of Huaraucaca 29/01/202529/01/2025 by laraconsulting
Quality assurance for the construction of the regrowth of the R4-R5 dikes and QA of production of construction materials for the R4-R5 dikes. 29/01/2025 by laraconsulting
Detailed engineering and construction consultancy of the sedimentation pond 2 and the protection dam of the ptaria la cota 4 214 MSNM 29/01/202529/01/2025 by laraconsulting