San Rafael Mining Unit
--- Mining waste ---
San Rafael
- Fecha: 2021
- - 2024
- Dirección: Departamento de Puno, Provincia de Melgar, Distrito de Antauta / 21205
- Coordenadas: E:357 516 N: 8 425 577
- Resumen: Support was provided in strategic projects, including the study of technologies for tailings disposal, training in mining infrastructure management according to the ICMM, development of the tailings management system and standardization of its management processes, feasibility studies, and technical and engineering support in tailings management."
-
Descripción:
- Conceptual study of tailings disposal technologies
- Standardization of geotechnical instrumentation
- Training program in mining infrastructure management according to the ICMM
- Review of tailings management and governance
- Internal gap analysis and GISTM adherence audit
- Preparation of the tailings management system and development of corporate standards for tailings management.
- Feasibility study of tailings thickening plant
- Geotechnical engineer support
- Supervision of drilling and geotechnical tests
- Tailings management alternative in B4
- Conceptual engineering of the tailings management system – Nazareth project
- Technical support in tailings management
- Feasibility design of the centrifuged tailings paste plant.
Related projects
Ready to Discover More projects?
At Lara Consulting, each project is a story of innovation and commitment. Learn more about our services or contact us to work together.