Atacocha Mining Unit
--- Geology ---
Engineering update and preparation of deliverables to support the ITS of the Tailings Thickening System and its transportation to the Atacocha Tailings Deposit
- Fecha: -
- - 2022
- Cliente: NEXA Resources
- Coordenadas: CQHP+C5C, Chicrin 19100
- Resumen: The project included a site visit to assess the conditions of the potential areas for relocating the thickening plant, considering geological, geotechnical and mechanical inspection aspects. Once the location was defined, the deliverables for the ITS were developed in collaboration with the consulting firm INSIDEO, specialized in environmental permits. In addition, a new pulp pumping station and a pumping system to Atacocha were designed, updating the engineering report deliverables provided by Nexa. This approach guaranteed a comprehensive technical solution aligned with the project requirements.
-
Descripción:
- Field visit to evaluate plant relocation areas with geotechnical, mechanical and piping inspection.
- Development of deliverables for the plant relocation ITS, subcontracting INSIDEO as a specialized consultant.
- Design of the new pulp pumping station and the pumping system towards Atacocha, along with updating the deliverables of the engineering.