Colquijirca Mining Unit
--- Geology ---
Engineering For The Hydraulic Barrier System For Filtrationss Of The Huachuacaja Tailings Deposit
- Fecha: -
- - 2024
- Cliente: Compañía de Minas Buenaventura S.A.A
- Coordenadas: 6PRQ+62H, Colquijirca 19400
- Resumen: Includes supervision of geotechnical investigations (drilling, well development, and geological reconnaissance) and instrumentation and monitoring (piezometers and inclinometers).
-
Descripción:
- Hydrogeological evaluation to support the design of the hydraulic barrier
- Predictive simulations, estimation of local flow directions and operating flow rates of the leak contingency system
- Defining the hydraulic barrier system
- Diagnosis and evaluation of water management
- Estimation of CAPEX and OPEX
Related projects
Ready to Discover More projects?
At Lara Consulting, each project is a story of innovation and commitment. Learn more about our services or contact us to work together.