Quality assurance for the stabilization of the R2 and R4 tailings deposits of Huaraucaca 29/01/202529/01/2025 by laraconsulting
Detailed engineering of the heightening of the R1-5 reservoir – Stage 1A – U.E.A.(Administrative economic unit) 29/01/202529/01/2025 by laraconsulting
Quality assurance for the construction of the regrowth of the R4-R5 dikes and QA of production of construction materials for the R4-R5 dikes. 29/01/2025 by laraconsulting
Quality assurance (CQA) of the execution of earthworks and civil works of the R1-5 tailings dam, U.E.A.(Administrative economic unit) 29/01/202529/01/2025 by laraconsulting
QA of the extraction of tailings from the R8 tailings deposit and its deposition in the Tajo Herminia and QA of the reinforcement of the R1 – R5 buttress – U.E.A.(Administrative economic unit) 29/01/202529/01/2025 by laraconsulting
Evaluation of quarries for obtaining type 4 material for the Huachuacaja dam expansion – Stage 4 and Stability/Layout Analysis 29/01/202529/01/2025 by laraconsulting
Detailed engineering and construction consultancy of the sedimentation pond 2 and the protection dam of the ptaria la cota 4 214 MSNM 29/01/202529/01/2025 by laraconsulting