GAP analysis and standardization of tailings management for the mining units of Capstone Copper 31/01/2025 by laraconsulting
Preparation of the basic engineering and ITS file (of Deposit 7 and the Filtered Tailings Treatment Plant 31/01/2025 by laraconsulting
Development of corporate standards and the tailings management system for each mining unit 31/01/2025 by laraconsulting
Project name:Detailed Engineering for the Pahuaypite 1 and 2 tailings deposits and the Pahuaypite 2 waste dump 29/01/2025 by laraconsulting
Basic Engineering of Deposit 7 and the Filtered Waste Treatment Plant (PTRF) 29/01/2025 by laraconsulting