Capstone Mining Unit
--- Mining waste ---
GAP analysis and standardization of tailings management for the mining units of Capstone Copper
- Fecha: 2023
- - 2024
- Dirección: Pinto Valley - Arizona, Estados Unidos. Cozamin - Zacatecas, México. Mantos Blancos - Antofagasta, Chile. Mantoverde - Atacama, Chile. Santo Domingo - Atacama, Chile
- Resumen: CSC's objective is to achieve compliance status in each of the requirements of the Global Industry Standard on Tailings Management (GISTM) by 2026, for which it is considered key to have a "Tailings Management System (TMS)" in accordance with the ICMM recommendations (2021).
-
Descripción:
- Basic engineering of the PTRF2. Basic engineering of Deposit 7.
- ITS report.
- Subcontracting of Geotechnics for supervision of drilling, test pits and execution of geophysics.
- Subcontracting of Topography for topographic survey.
Related projects
Ready to Discover More projects?
At Lara Consulting, each project is a story of innovation and commitment. Learn more about our services or contact us to work together.