Cajamarquilla Mining Unit
--- Mining waste ---
Preparation of the basic engineering and ITS file (of Deposit 7 and the Filtered Tailings Treatment Plant
- Fecha: 2019
- - 2024
- Cliente: NEXA Resources
- Coordenadas: 24H7+JMQ, Lurigancho-Chosica 15461
- Resumen: Lara Consulting carried out the update of the Basic and Feasibility Engineering for the Filtered Tailings Treatment Plant (FTTP) and the Deposit 7 of the "New Deposit 7" project by Nexa Resources. The focus of this work was to optimize the design to reduce the initial investment (CAPEX) without affecting the processes, ensuring a compact plant that maximizes the use of available space. Relocations and adjustments were included to make use of idle infrastructure and equipment, avoiding disruptions in operations during construction. In addition, Lara Consulting managed the obtaining of environmental and operational permits in accordance with Peruvian standards, ensuring regulatory compliance and operational continuity.
-
Descripción:
- Basic engineering of the PTRF
- Basic engineering of Deposit 7
- ITS report
- Subcontracting of Geotechnics for supervision of drilling, test pits and execution of geophysics
- Subcontracting of Topography for topographic survey
Related projects
Ready to Discover More projects?
At Lara Consulting, each project is a story of innovation and commitment. Learn more about our services or contact us to work together.