Julcani Mining Unit				
					--- Quality Control and Management ---
Detailed engineering of the heightening of the R1-5 reservoir – Stage 1A – U.E.A.(Administrative economic unit)
- Fecha: -
 - - 2023
 
- Cliente: Compañía de Minas Buenaventura S.A.A
 - Coordenadas: 355W+G45, Ccochaccasa 09400
 
- Resumen: A comprehensive study was carried out for the construction of the R1-R5 reservoir extension. This included a detailed site inspection, stability analysis of the existing reservoir, detailed design of the sealing, drainage and containment structures, as well as the preparation of construction drawings, technical specifications and a cost estimate. In addition, the quality assurance manuals were updated to ensure the correct execution of the works. The final objective was to generate a complete technical report that would allow the construction of the reservoir extension to begin in a safe and efficient manner.
 - 
										 Descripción: 
- Geotechnical-hydraulic survey visit to the R1-R5 reservoir.
 - Stability analysis of the R1-R5 reservoir.
 - Detailed design of evacuated sealing, leak collection and operational channel.
 - Design of buttress and main dam for Stage 1A.
 - Preparation of construction drawings at the detailed engineering level.
 - Update of technical construction specifications.
 - Update of quality assurance manuals.
 - CAPEX cost estimate.
 - Preparation of the construction report.
 
 