Preparation of the basic engineering and ITS file (of Deposit 7 and the Filtered Tailings Treatment Plant 31/01/2025 by laraconsulting
Basic Engineering of Deposit 7 and the Filtered Waste Treatment Plant (PTRF) 29/01/2025 by laraconsulting