Colquijirca Mining Unit
--- Quality Control and Management ---
Quality assurance for the stabilization of the R2 and R4 tailings deposits of Huaraucaca
- Fecha: -
- - 2024
- Cliente: Sociedad Minera El Brocal S.A.A
- Coordenadas: 6PQP+RWQ, Colquijirca 19400
- Resumen: Perform the QA for quality assurance for the Stabilization of the R2 and R4 Huaraucaca Tailings Deposits
-
Descripción:
- Construction supervision in the field and laboratory for the construction of the buttresses of the R2 and R4 tailings deposits.
- QA supervision of the quarry and placed materials for the buttress of the R2 and R4 tailings deposits.
- RFI response.
- Quality dossier.
- External laboratory tests.