- Resumen: Lara Consulting was in charge of carrying out a meticulous quality assurance (QA) process for the construction of the increase in the west dam of the R4A Tailings Deposit to the level of 3811 m a.s.l. Using advanced QA procedures and technology, the Lara Consulting team supervised that the geosynthetic-reinforced soil construction system rigorously complied with the standards and specifications of the construction drawings, guaranteeing maximum safety and durability of the work.
-
Descripción:
- QA Construction for the heightening of the west dike of the Deposit R4A tailings at elevation 3,811 m a.s.l.
- RFI Responses.
- Quality dossier.