Cajamarquilla Mining Unit
--- Mining waste ---
Deposit 7 CJM – Waste disposal – Cajamarquilla Refinery – Nexa
- Fecha: 2020
- - 2021
- Cliente: NEXA Resources
- Coordenadas: 24H7+JMQ, Lurigancho-Chosica 15461
- Resumen: Lara Consulting has developed the FEL-2 study for the "Deposit 7 CJM" project at the Cajamarquilla Refinery, ensuring an optimal and safe design for the storage of Jarosite waste using advanced filtered and compacted tailings technologies. The use of non-conventional techniques has been evaluated, such as co-disposal with quarry or waste rock materials, the application of binders and drying technologies, adapting the solution to the high seismic conditions of the area. In addition, we collaborate in the engineering planning and permits, prioritizing the viability so that the deposit and the tailings dewatering plant can be operational within 3 to 4 years.
-
Descripción:
- Metallurgical and Geotechnical Studies of Jarosite.
- Supervision of geotechnical investigations (drilling, test pits, seismic refraction).
- Updating of geotechnical and hydrological studies.
- Geological, hydrogeological and hydrological characterization.
- Evaluation of quarries and soil quality.
- Hydrogeological and solute transport models.
- Diagnosis and pumping tests in wells and piezometers.
- Proposals for improvement and rehabilitation of wells.
- Technical reports and monitoring network.
- Evaluation of stabilizing elements, equipment, location and transport.
- Design of pumping stations, thickening and filtering plant, neutralization system and waste deposit.
- RFP, hydrogeological reports, survey of observations and MEIA, final engineering report.
Related projects
Ready to Discover More projects?
At Lara Consulting, each project is a story of innovation and commitment. Learn more about our services or contact us to work together.