Construction report for tailings extraction from R8 and disposal at the Herminia pit – U.E.A.(Administrative economic unit) 31/01/2025 by laraconsulting
Feasibility study for the extraction of tailings from the R7 deposit and disposal in the R1-R5 Deposit – U.E.A.(Administrative economic unit) Julcani 31/01/2025 by laraconsulting
Detail engineering for the stabilization of tailings deposits R2 and R4 at Huaraucaca 31/01/2025 by laraconsulting
Detailed engineering for the heightening of DRFT 1 to elevation 4470 – UM Tambomayo. 31/01/2025 by laraconsulting
QA SUPERVISION OF THE PROJECT – CONSTRUCTION OF THE WEST DIKE HEIGHTENING OF TAILINGS DAM R4A elevation: 3 811 m a.s.l. 31/01/2025 by laraconsulting