Colquijirca Mining Unit
--- Quality Control and Management ---
Detailed engineering and construction consultancy of the sedimentation pond 2 and the protection dam of the ptaria la cota 4 214 MSNM
- Fecha: -
- - 2020
- Cliente: Sociedad Minera El Brocal S.A.A
- Coordenadas: 6PQP+RWQ, Colquijirca 19400
- Resumen: Detailed engineering development and specialized consulting to build the Protection Dike for the WWTP at 4,214 masl and reinforce Sedimentation Pond 2 (PS2) with rockfill at its base. This system provides a solid foundation for the future expansion of Dike R5 (4,216 masl) and ensures the protection of PS2, with ongoing support from a field engineer with expertise in construction.
-
Descripción:
- Ongoing construction consulting, provided by a civil engineer, aimed at identifying opportunities for improvement in the construction process and in the use of materials, focused on the protection dike of the WWTP at 4,214 masl and the protection works of PS2.
- Consulting for technical field inquiries (RFIs), which includes the formulation and resolution of technical inquiries related to the construction of the protection dike of the WWTP at 4,214 masl.
- Engineering design, including the development of the protection dike of the WWTP at 4,214 masl, the protection works of PS2 and the access road to the PS1 pool.
- Execution of five (5) plans that are part of the plans for the expansion of the R4 and R5 dams to the 4,214 masl elevation, based on the specifications and QA manuals applied in the construction of the R4 and R5 dams.
Development of measurements, schedule and execution plan, which specifies the measurements of materials, the schedule and the execution plan of the designed works, including the necessary drawings for the construction.
Related projects
Ready to Discover More projects?
At Lara Consulting, each project is a story of innovation and commitment. Learn more about our services or contact us to work together.